Exhaust Temp in/Out
400 C / 266 C
Water Temp In/Out
30 C / 293 C
Exhaust/Water Mass Flow
Exhaust/Water Mass Flow
11,016 / 180,000 Kg/h
12,000 / 6,374 Kg/h
Energy Recovered
528 KW
Recovered Energy Value
$155K p/a
Heat Exchanger Cost
$150K
Payback Period
16 Months
Price per KW recovered
$123 (£76)
![Screen Shot 2019-02-13 at 12.38.58.png](https://static.wixstatic.com/media/302b9c_a4a494b852b94f52bc663bb9312871f0~mv2.png/v1/fill/w_380,h_195,al_c,q_95,enc_avif,quality_auto/Screen%20Shot%202019-02-13%20at%2012_38_58.png)
-
Econotherm®GA 360 smooth pipe heat exchanger
-
500 kW combustion air pre-heater
-
High particulate matter exhaust from furnace
-
Low fouling, easy cleaning and maintenance, high reliability
-
Unit positioned outside main factory premises
-
Customer advised it was not possible by consultants (acid etc)
Air Pre-Heater, Large Petrochemical Plant, Freeport Texas, 2016
12,000 / 6,374 Kg/h
48,856 / 49,124 Kg/h
Exhaust/Water Mass Flow
Exhaust/Air Flow Rate
26 C / 254 C
Air Temp In/Out
360 C / 142 C
Exhaust Temp in/Out
Gas to Air
£750K
Project Cost
£563K p/a
Recovered Energy Value
3,100 KW
Energy Recovered
£241
Price per KW recovered
19 Months
Payback Period
![dow unit.jpg](https://static.wixstatic.com/media/2abadb_a0887a468d8a4ded904d4b6b087d479b~mv2_d_2402_1974_s_2.jpg/v1/fill/w_426,h_350,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/dow%20unit.jpg)
![Screen Shot 2019-04-25 at 10.23.01.png](https://static.wixstatic.com/media/2abadb_7e22674bcbd049368e89d78779395f3f~mv2.png/v1/fill/w_460,h_387,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Screen%20Shot%202019-04-25%20at%2010_23_01.png)
-
Econotherm®GA 3100 finned pipe counter flow air pre heater
-
Ethylene cracking furnace combustion air pre-heater
-
Distilled water working fluid pipes
-
ASME design code compliant, fully NDT tested
-
Carbon steel finned pipe design